Mon - Fri: 6:30am - 4:00pm | Sat: by arrangement

Brickies Sand for Mortar and Block Work, Delivered Across Perth

Yellow pit sand with the clay content brickies want for a fat, workable mortar.

Sands Quarry Direct Approx. 1.6 t per m³ Perth metro delivery
Brickies Sand close up, supplied and delivered across Perth by Red Sand Supplies
Brickies Sand in use on a Perth job, supplied and delivered across Perth by Red Sand Supplies

The bricklayer's staple. A yellow pit sand carrying enough natural clay to give mortar the fatty, workable feel brickies look for on the trowel, holding its shape without going harsh or short. Ask about current stock and delivery timing for your suburb when you request a quote.

Supplied to order from trusted WA sand pits and delivered on our own fleet.

What Brickies Sand is used for

  • Brick and block mortar
  • Limestone block work
  • Bagging and patching
  • Filling lawn low spots

Specifications

MaterialYellow pit sand with natural clay content
FinishFat, workable mortar that holds on the trowel
ColourYellow
SourceWA sand pits, supplied to order
Good to knowMost brickies mix around 6 parts sand to 1 part cement
Approx. density1.6 tonnes per m³ loose
CoverageAbout 6.2 m² per tonne at 100mm depth
SuppliedQuarry Direct, sourced from trusted WA quarries and pits
DeliveryPerth metro on our own fleet, or pick up from Hope Valley

Buying and delivery

Sold by the cubic metre or tonne and delivered on our own trucks, tipped where you need it on site, or available to pick up from Hope Valley. Supplied to order from trusted WA sand pits, so turnaround depends on quarry stock and delivery scheduling.

Not sure how much you need? The volume calculator works out cubic metres and tonnes from your measurements and drops the result straight into a quote request. At 100mm deep, one tonne of brickies sand covers about 6.2 square metres.

Add Brickies Sand to a quote Work out quantities

Questions

Questions about Brickies Sand

How much brickies sand do I need for a mortar mix?

It weighs around 1.6 tonnes per cubic metre. Most brickies mix around 6 parts sand to 1 part cement, so a general estimate is roughly 1 cubic metre of sand per 1000 to 1200 standard bricks, depending on joint size.

What mix ratio do brickies use with this sand?

Most brickies mix around 6 parts sand to 1 part cement, though the exact ratio varies by job and specification. Give us a call on 0409 490 292 or request a quote online and we can talk through the details for your job.

Can brickies sand be used for anything besides mortar?

Yes, it's also used for limestone block work, bagging and patching, and filling low spots in lawns. You're welcome to check with us directly, we're happy to talk through the specifics of your job before you order.

Why does mortar sand need clay content?

The natural clay content gives the mortar a fat, workable feel that holds on the trowel, rather than going harsh or crumbly. Give us a call on 0409 490 292 or request a quote online and we can talk through the details for your job.

Also in Sands

Related products

Spearwood Red (-5mm)

Our namesake. Screened -5mm Spearwood red sand for fill, pads, lawns and gardens.

View Spearwood Red (-5mm) »

Plastering Sand

Fine, low-clay sand that renders smooth and levels off clean. Supplied to order.

View Plastering Sand »

Paving Sand

Screeds flat and compacts firm. A reliable base under pavers, slabs and steps.

View Paving Sand »

Bedding Sand

Free-flowing sand for pipe and cable bedding, and a clean bed for paving work.

View Bedding Sand »

Lawn Sand

Free-draining lawn sand for laying new turf and top dressing tired lawns.

View Lawn Sand »

White Washed Sand

Bright washed sand with the fines removed. Sandpits, paving joints and finishes.

View White Washed Sand »

Need Brickies Sand delivered in Perth?

Send a quote request and we will come back with a firm delivered price, or call the yard.

☎ Call Now Get a Quote