Mon - Fri: 6:30am - 4:00pm | Sat: by arrangement

75mm Crushed Limestone Sub-Base, Delivered Across Perth

Big 75mm crushed limestone for sub-base bulk, haul roads and site access.

Road Base Quarry Direct Approx. 1.6 t per m³ Perth metro delivery

Crushed limestone with rock up to 75mm plus fines, the material to reach for when you need depth under a pavement. It builds sub-base lifts, haul roads and hardstands quickly, locking together as it compacts. It suits both DIY weekend jobs and larger contract work across the Perth metro area.

It builds sub-base lifts, haul roads, hardstands and site access quickly, locking together as it compacts. Cap it with 19mm limestone or road base for a tighter finished surface.

What Limestone (75mm) is used for

  • Deep sub-base lifts
  • Haul roads
  • Site access tracks
  • Hardstands and laydown areas
  • Fill over soft ground

Specifications

GradingRock and fines up to 75mm
MaterialWA limestone
CompactionLay in lifts and roll, locks up well
SupplyQuarry direct, supplied to order
Good to knowCap with 19mm limestone for a tight running surface
Approx. density1.6 tonnes per m³ loose
CoverageAbout 6.2 m² per tonne at 100mm depth
SuppliedQuarry Direct, sourced from trusted WA quarries and pits
DeliveryPerth metro on our own fleet, or pick up from Hope Valley

Buying and delivery

Sold by the cubic metre or tonne and delivered on our own trucks, tipped on site, or picked up from Hope Valley. Supplied to order, so tell us your tonnage and we'll confirm quarry stock and a delivery date. Get in touch with your job details and we'll sort a delivery time that works.

Not sure how much you need? The volume calculator works out cubic metres and tonnes from your measurements and drops the result straight into a quote request. At 100mm deep, one tonne of limestone (75mm) covers about 6.2 square metres.

Add Limestone (75mm) to a quote Work out quantities

Questions

Questions about Limestone (75mm)

How much 75mm limestone do I need for a sub-base?

It weighs around 1.6 tonnes per cubic metre. A 200mm sub-base lift over 30 square metres needs about 6 cubic metres, roughly 9.6 tonnes. Use our calculator for your own area.

How do I finish a 75mm limestone sub-base?

Lay it in lifts and roll to lock it up well, then cap it with 19mm limestone or road base for a tighter finished surface. You're welcome to check with us directly, we're happy to talk through the specifics of your job before you order.

Is 75mm limestone good for haul roads?

Yes, it builds sub-base lifts, haul roads, hardstands and site access tracks quickly, and copes well with heavy site traffic. Give us a call on 0409 490 292 or request a quote online and we can talk through the details for your job.

Can it be used to fill over soft ground?

Yes, it's a common choice for filling over soft ground before capping with a finer base material. You're welcome to check with us directly, we're happy to talk through the specifics of your job before you order.

Also in Road Base

Related products

Gravel Road Base (-19mm)

Screened -19mm laterite gravel that binds hard into a classic red country driveway.

View Gravel Road Base (-19mm) »

Gravel Road Base (-10mm)

Finer -10mm laterite gravel that knits into a tight, smooth surface for drives and paths.

View Gravel Road Base (-10mm) »

Ferrocrete (12mm)

Laterite road gravel, also spelt ferricrete. Nominal 12mm, binds down hard for drives and tracks.

View Ferrocrete (12mm) »

Blue Metal Road Base

Crushed granite road base from Byford, the heavy duty pick for structural pavements.

View Blue Metal Road Base »

Limestone (19mm)

19mm crushed limestone, the standard Perth base under paving, driveways and crossovers.

View Limestone (19mm) »

Need Limestone (75mm) delivered in Perth?

Send a quote request and we will come back with a firm delivered price, or call the yard.

☎ Call Now Get a Quote